This project will complete the Sparwood Lunch Loop Trail Network with an additional 900m of trails called Lunch Money (a flow trail) and Smoko (a connector trail to Sloppy Joe).
This project will complete the Sparwood Lunch Loop Trail Network with an additional 900m of trails called Lunch Money (a flow trail) and Smoko (a connector trail to Sloppy Joe).